| Availability: | |
|---|---|
| Quantity: | |
SN-4500TL
SNOWBALL
8477.4010.00
Ease of production of relatively larger products in varying sizes but similar output by the carousel machine with three or four arms and three to four stations; two doors; oven is floor-mounted.



Technical data sheet:
Model No. | Oven Size(mm) | Machine Dimensions(mm) | Total Power (kw) | Biggest tank made | ||
L | W | H | ||||
SN-2000TL | Ø2000 | 10000 | 8000 | 3500 | 24.75 | 1000L |
SN-2500TL | Ø2500 | 13500 | 9000 | 4000 | 35 | 2500L |
SN-3000TL | Ø3000 | 15500 | 10500 | 4500 | 35 | 4500L |
SN-3500TL | Ø3500 | 17500 | 11500 | 5100 | 45.95 | 7000L |
SN-4000TL | Ø4000 | 19500 | 13500 | 5600 | 56.60 | 10000L |
SN-4500TL | Ø4500 | 21500 | 15500 | 6100 | 62.60 | 14000L |

Machine Control system:
1. PLC--- Siemens S7-200
2. Touch screen(Could remote control)
3. Frequency Changer--- Siemens
4. Electric Unit--- Schneider
5. Burner--- Riello (RS serial)
6. Limit switch--- OMRON,
7. One of the Emergency switches from Schneider
8. Motors from Siemens.gear box brand: Redsun
9. Main shaft dia is 146mm.wall thickness 35mm






Rotational molding machine CE Certificate:

Shipping:By sea with open top or normal 40'HQ containers.

FAQ:
Q1. What is your company main products?
A:Our company is mainly producing rotational molding machine, mold and cooler box.
Q2. What is the MOQ for your production?
A:For rotomolded cooler,the MOQ is 50pcs;sample is available,only undertake sample cost and courier fee.We will return the sample cost when you place order.
Q3. What is your payment terms?
A:Machine&mold:50% deposit TT transfer after sign contract, and balance 50% after inspection before shipment.
Cooler box:30% deposit TT transfer and balance upon Bill of Lading copy.
Q4. What is your delivery date?
A:For machine, usually Within 60 working days upon receipt of deposit TT transfer.
For cooler box, within 20-30 working days for one 40HQ after receive deposit
Q5. Transportation
A:From Shanghai or Ningbo port by sea or by air
Q6. How about your after-sale services?
A:Machine Warranty:one year after installation and adjustment for trial in customer's workshop. We will assign two engineers to help customer assemble and trial run the machine.
Cooler box warranty: we will compensate a new one in your next order.
Q7. Do you test all your goods before delivery?
A: Yes, we test 100% of machine by our engineers before leave our company